System Engineering " Industrial Engineering"
y.
vii.SolarSPELL has done something similar in the past so our understanding of the requirements is nominal.
viii.The technical risk and architectural understanding are low for this effort.
ix.Because of student help and instructor turn over at remote locations, continuity of our team has been low and must be addressed, but you need to validate these assumptions.
x.There are also other effort cost drivers, please estimate those and their level of severity, and show why.
(Hint: please use the CoSYSMo equation to express the final estimate instead of letting me guess wrong what you were thinking.